MicroBT WhatsMiner M7D (654 TH)

Hosting starts from $0.058/kWh

Product information

$8,585

In Stock
Hashrate: 654 TH/sPower: 9483 W
Buy now

Revenue Calculator

BTC mined per month: 0.00977 BTC

Current BTC Price

BTC @ $65,000

Monthly Revenue
$635
Annual Revenue
$7,727

If BTC Reaches

BTC @ $100,000

Monthly Revenue
$977
Annual Revenue
$11,888

If BTC Reaches

BTC @ $200,000

Monthly Revenue
$1,954
Annual Revenue
$23,776

*Revenue estimates assume constant network difficulty and 100% uptime.

Hosting Plans

Saver

$0.058/kWh
$396.01/month
  • Setup Fee: $855
  • Transport Fee: $150
  • Hosting Advance: $0 (Promotion)
  • 36-month contract
  • Hydro installation: $90/kW
  • Air installation: $45/kW

Pro

$0.068/kWh
$464.29/month
  • Setup Fee: $570
  • Transport Fee: $150
  • Hosting Advance: $0 (Promotion)
  • 36-month contract
  • Hydro installation: $60/kW
  • Air installation: $30/kW

Elite

$0.078/kWh
$532.57/month
  • Setup Fee: $0
  • Transport Fee: $150
  • Hosting Advance: $0 (Promotion)
  • 36-month contract
  • Installation included

Description

The MicroBT WhatsMiner M7D (654 TH) from Microbt is a high-performance ASIC miner designed for the SHA256 algorithm. It delivers a hashrate of 654 with a power consumption of 9483, offering an efficiency of 14.5 J/TH.

Hashrate
654
Power
9483
Efficiency
14.5 J/TH
Algorithm
SHA256

Technical Specifications

Manufacturer
Microbt
Model
MicroBT WhatsMiner M7D (654 TH)
Release
Latest Batch
Noise Level
75db
Fan(s)
4
Interface
Ethernet
Temperature
5 - 45 °C
Humidity
5 - 95 %

Buy MicroBT WhatsMiner M7D (654 TH) - 654 SHA256 ASIC Miner

Looking to buy the MicroBT WhatsMiner M7D (654 TH)? Segments offers this high-performance Microbt ASIC miner with 654 hashrate and 14.5 J/TH efficiency for SHA256 mining. Compare availability, logistics, and optional hosting before placing an order.

Review professional ASIC hosting options for your MicroBT WhatsMiner M7D (654 TH) with Segments. We provide secure hosting sites, transparent power rates, and support for fast deployment planning.

Also Known As (Search Terms)

M7D (654 TH) 654th, WhatsMiner M7D (654 TH) 654th, Whats Miner M7D (654 TH) 654th, Microbt M7D (654 TH) 654th, M7D (654 TH) 654ths, WhatsMiner M7D (654 TH) 654ths, Whats Miner M7D (654 TH) 654ths, Microbt M7D (654 TH) 654ths, M7D (654 TH) 654 th/s, WhatsMiner M7D (654 TH) 654 th/s, Whats Miner M7D (654 TH) 654 th/s, Microbt M7D (654 TH) 654 th/s, M7D (654 TH) 654t, WhatsMiner M7D (654 TH) 654t, Whats Miner M7D (654 TH) 654t, Microbt M7D (654 TH) 654t, M7D (654 TH) 654, WhatsMiner M7D (654 TH) 654, Whats Miner M7D (654 TH) 654, Microbt M7D (654 TH) 654, WhatsMiner M7D (654 TH), Microbt M7D (654 TH), M7D(654TH), M7D(654TH) 654th

MicroBT WhatsMiner M7D (654 TH) | ASIC Mining Machine | <24h Plug-In | Segments