Build a mining site

Bitcoin mining data centres, built for you in the UAE

We find the land, get the approvals, build the electrical infrastructure and hand over a working hall, cooled by air, hydro or immersion. We have built mining facilities like these in the UAE for 5 years, and run 10 of our own.

years building mining facilities in the UAE
5
hosting centres we run ourselves
10
MVA of new hydro-cooled capacity being built
10.5
cooling types we build: air, hydro and immersion
3

Recent builds

Liwa and Al Rimah: our builds for Active Energy Group

Two mining sites in the UAE for Active Energy Group (AIM: AEG), the London-listed company we work with: one finished, one being built now. Each needed new power lines run to the plot.

Liwa

Finished
MVA of power
6
m² site
40,000
km of power lines pulled to the site
15
months from start to hand-over
7

Al Rimah

In progress
MVA of power
6
km of power cable laid
8
months planned for the build
6

Our venture with Active Energy Group

In January 2026 Segments signed heads of terms with Active Energy Group and LC Group to form Active Mining Group, a UAE venture in which we hold 20%. We bring the technical side: building and running ASIC mining sites.

Active Energy has announced a roadmap to more than 300 MW of capacity in the UAE, with the venture as the base of its 100 MW plan. Liwa and Al Rimah are part of that build-out.

How a build works

From a plot of land to a running hall

We take orders for any turnkey build, from one hall to a full site. One team handles every step, so you deal with one company from the land to the hand-over.

  1. 01

    Land, leased or bought

    We find a plot that suits the power you need and secure it, on lease or by purchase. If you already have land, we build on yours.

  2. 02

    Approvals

    We apply for the permits and approvals the site needs and follow them through before building starts.

  3. 03

    Electrical infrastructure

    We build the power side of the site: transformers, switchgear and distribution out to every rack.

  4. 04

    The hosting hall

    We build the hall around the cooling you choose: air, hydro or immersion, sized for the machines you will run.

  5. 05

    Commissioning and hand-over

    We power the site up, check it under load and hand it over running. If you would rather not run it yourself, ask us about operating it.

Cooling

Air, hydro or immersion

We build all three. Which one fits depends on the machines you will run, your budget and the site.

Air-cooled

Machines run on their own fans in a hall with hot and cold aisles. The lowest build cost per MW.

  • Hot and cold aisle containment
  • Industrial exhaust fans
  • Filtered air intake

Hydro-cooled

Water circuits carry the heat away from hydro miners. More machines per hall, and steady temperatures through the summer.

  • Closed-loop water circuits
  • More machines per hall
  • Less noise and dust

Immersion

Miners sit in tanks of dielectric fluid that carries the heat away. Built to order for the machines you choose.

  • Dielectric fluid tanks
  • No fans on the machines
  • Boards sealed from dust

AI data centre

Tier III-standard facilities for high-performance computing and AI workloads.

  • Redundant power (2N)
  • Precision cooling
  • Clean-room environment

Every build is priced per project. The price depends on the land available and how far it is from the nearest substation.

How air, hydro and immersion compare in Gulf heat

A build for a client

Hydro mining in a converted villa

A turnkey hydro build we did for a client inside a villa: water-cooled racks, the pump skid and the control panels, handed over ready to run.

  • Miner racks on water circuits
  • Pump skid and expansion tank
  • Control panel and monitoring screen

We run what we build

Our own centres are the reference

Segments runs 10 hosting centres in the UAE: 5 hydro-cooled and 5 air-cooled. Two new hydro-cooled centres, F57 (6 MVA) and F58 (4.5 MVA), are being built now. Ask to tour a site before you sign.

Questions

How long does a build take?
Standard projects are finished within 90 to 120 days of breaking ground. Large sites, or sites waiting on a new power connection, take longer; the quote comes with a timeline for your site.
Do you find the land?
Yes. We find a plot that suits the power you need and secure it on lease or by purchase. If you already have land, we build on yours.
Do you handle the approvals?
Yes. We apply for the permits and approvals the site needs and follow them through before building starts.
Which cooling should I choose?
Air-cooled halls cost the least to build. Hydro suits hydro miners and fits more machines into a hall. Immersion puts the machines in fluid tanks with no fans. Tell us the machines you plan to run and we will recommend one.
What does a build cost?
Every build is quoted per project. The price depends on the land available, how far it is from the nearest substation, and the cooling and machines you choose. Send us the power you need and where, and we will come back with a quote.

Tell us what you want to build

Send us the power you need, the cooling you have in mind and where. We reply with a plan and a quote.