Liwa
Finished- MVA of power
- 6
- m² site
- 40,000
- km of power lines pulled to the site
- 15
- months from start to hand-over
- 7
Build a mining site
We find the land, get the approvals, build the electrical infrastructure and hand over a working hall, cooled by air, hydro or immersion. We have built mining facilities like these in the UAE for 5 years, and run 10 of our own.
Recent builds
Two mining sites in the UAE for Active Energy Group (AIM: AEG), the London-listed company we work with: one finished, one being built now. Each needed new power lines run to the plot.
In January 2026 Segments signed heads of terms with Active Energy Group and LC Group to form Active Mining Group, a UAE venture in which we hold 20%. We bring the technical side: building and running ASIC mining sites.
Active Energy has announced a roadmap to more than 300 MW of capacity in the UAE, with the venture as the base of its 100 MW plan. Liwa and Al Rimah are part of that build-out.
Read the announcements
How a build works
We take orders for any turnkey build, from one hall to a full site. One team handles every step, so you deal with one company from the land to the hand-over.
01
We find a plot that suits the power you need and secure it, on lease or by purchase. If you already have land, we build on yours.
02
We apply for the permits and approvals the site needs and follow them through before building starts.
03
We build the power side of the site: transformers, switchgear and distribution out to every rack.
04
We build the hall around the cooling you choose: air, hydro or immersion, sized for the machines you will run.
05
We power the site up, check it under load and hand it over running. If you would rather not run it yourself, ask us about operating it.
Cooling
We build all three. Which one fits depends on the machines you will run, your budget and the site.
Machines run on their own fans in a hall with hot and cold aisles. The lowest build cost per MW.
Water circuits carry the heat away from hydro miners. More machines per hall, and steady temperatures through the summer.
Miners sit in tanks of dielectric fluid that carries the heat away. Built to order for the machines you choose.
Tier III-standard facilities for high-performance computing and AI workloads.
Every build is priced per project. The price depends on the land available and how far it is from the nearest substation.
How air, hydro and immersion compare in Gulf heatA build for a client
A turnkey hydro build we did for a client inside a villa: water-cooled racks, the pump skid and the control panels, handed over ready to run.
We run what we build
Segments runs 10 hosting centres in the UAE: 5 hydro-cooled and 5 air-cooled. Two new hydro-cooled centres, F57 (6 MVA) and F58 (4.5 MVA), are being built now. Ask to tour a site before you sign.
Send us the power you need, the cooling you have in mind and where. We reply with a plan and a quote.