LiveBTC$79,893Hashprice$0.036/TH/dayDifficulty140.6 THalvingin 530 daysHosting space open atF39,F40,F54+5 moreas of 08:40 GST

New capacity · United Arab Emirates

10.5 MVA of new hydro hosting in the UAE.

Two new sites for water-cooled miners, with room for about 1,622 machines. Host one machine or a whole container, bring your own hydro miners or buy them from us. Tell us what you want to host and we come back with a quote.

Hydro hosting at 6.8¢/kWh, all-in · 12-month contracts · no minimum order

Film: Bitmain Antspace hydro containers at one of our running UAE centres. The new sites get Antspace HW5 containers, now in transit.

The sites

One site energised. The next one ready.

Each site is prepared ground with its power connection. Our Bitmain Antspace HW5 hydro containers are on their way and are placed on the sites as hosting contracts are signed. We plan 85% of the transformer rating for miners, counted in hydro miners of 5.5 kW.

F57

Water-cooled (hydro) · United Arab Emirates

Energised
transformer rating
6 MVA
for miners
≈ 5,100 kW
hydro miners of 5.5 kW
≈ 927
  1. Power connection built: Done
  2. Final inspection: Done
  3. Energised: Done
  4. Taking hosting contracts: Done

Power is on. Containers go in as contracts are signed; we agree your installation date in your quote.

F58

Water-cooled (hydro) · United Arab Emirates

Awaiting energising
transformer rating
4.5 MVA
for miners
≈ 3,825 kW
hydro miners of 5.5 kW
≈ 695
  1. Power connection built: Done
  2. Final inspection: Pending
  3. Energised: Pending
  4. Taking hosting contracts: Pending

We publish the energising date once it is set. Enquire now and we plan your container and installation around it.

The containers

Antspace HW5 containers, on their way.

Antspace HW5 · Ordered · in transit

The new sites are open ground with power connected. Our Bitmain Antspace HW5 hydro containers are ordered and in transit, and are placed on the sites as hosting contracts are signed. The film shows Antspace hydro containers at one of our running UAE centres.

hydro miners per container (S21 Hyd and S19 Hyd series)
210
power per container
1,062 kW
container, with a dry-wet cooling tower
40 ft
cooling tower capacity
1,200 kW

Figures as Bitmain publishes them for the HW5.

Illustration of four Antspace HW5 hydro containers with cooling towers on a desert siteIllustration
Illustration, not a photo: Antspace HW5 containers on a desert site.

Why water cooling

Made for a UAE summer.

  1. 01

    Heat stays outside the machine

    Air-cooled miners breathe the air around them, and a UAE summer passes 45 °C. Hydro miners are cooled by a water loop, so the hall's air temperature matters far less.

  2. 02

    No dust through the hashboards

    Hydro miners have no fans pulling sand and dust across their boards, a common cause of failures in air-cooled halls.

  3. 03

    Quiet and dense

    Without fans the containers are quieter, and more machines fit in the same space.

Prices

Hydro hosting prices.

The same plans as all our hosting, with the installation fee for water-cooled machines. The rate is all-in: power, cooling, monitoring, cleaning and maintenance. Installation and transport are paid once.

Miners at 12 J/TH or better cannot pay installation up front; at 10 J/TH or better, installation is in the rate.

  • Standard

    6.8¢

    per kWh

    • 12-month contract
    • No deposit
    • Hydro installation $60/kW
  • Up front

    5.8¢

    per kWh

    • 12-month contract
    • No deposit
    • Hydro installation $90/kW
  • In the rate

    7.8¢

    per kWh

    • 12-month contract
    • No deposit
    • Installation included

Paying hosting ahead lowers the rate, down to 4.0¢/kWh. Blocks of 1 MW and more are quoted individually. See the conditions

How it works

From enquiry to hashing.

  1. 01

    Tell us what you want to host

    The form below or WhatsApp: how many machines, which models, and when.

  2. 02

    Get a quote

    We confirm the site, the usable power for your models, the rate and the installation date.

  3. 03

    Sign the agreement

    A 12-month hosting agreement with Segments Cloud Hash FZ-LLC.

  4. 04

    Ship or buy your miners

    Send us your hydro miners, or buy them from us and we install them.

  5. 05

    Watch them in your portal

    Every machine appears in your client portal with its hashrate and status.

Request capacity

Tell us what you want to host.

Our sales team replies on WhatsApp or by email with availability and a quote. No commitment until you sign an agreement.

Prefer WhatsApp?

WhatsApp
Your miners

We use these details only to answer your enquiry.

Who you deal with

A licensed UAE operator, already hosting.

Segments · Dubai, UAE. The legal company and its numbers are in the imprint and on every invoice.

10 hosting centres already running in the UAE.

See the centres

Come and see the site before you sign.

Book a site visit

Questions

How many miners fit at F57 and F58?
We plan 85% of a site's MVA rating for miners and count it in hydro miners of 5.5 kW: F57 (6 MVA) gives about 5,100 kW, room for about 927 miners and F58 (4.5 MVA) gives about 3,825 kW, room for about 695 miners. Your exact count depends on your models.
What is on the sites today?
The power. F57 is energised and F58 waits for final inspection and energising. Our Bitmain Antspace HW5 hydro containers are ordered and in transit, and are placed on each site as hosting contracts are signed.
When does F58 open?
Its power connection is ready and it is waiting for final inspection and energising. We confirm the date once it is set. If you enquire now, we plan your installation around it.
Can I host air-cooled miners here?
These sites are for water-cooled miners. Air-cooled machines go to our other UAE centres.
Is there a minimum order?
No. We host a single machine as well as a whole container.
Can I buy the miners from Segments?
Yes. Buy hydro miners from our catalogue and we install them on the site, or send us your own.
What does the rate include?
Power, cooling, monitoring, cleaning and routine maintenance. Installation and transport are charged once. Repairs and spare parts are quoted separately.
How long is the contract?
12 months. The rate is lower when you pay hosting ahead.
Is uptime guaranteed?
No. Our hosting agreement sets an uptime target, and we track every machine around the clock from the pool and from the site. You see each machine's status in your client portal.

Put your hydro miners to work in the UAE.

Tell us how many machines you want to host, and when.